top of page

Book an Engineer Inspection

$600.00 ・ 2 hr

Professional evaluation of the Structural, Electrical, Plumbing, and Mechanical components of the building. This is a non-destructive process where the engineer examines accessible portions of the building, including the crawlspace and attic where they are present or easily accessible. When applicable infrared thermal imaging is used to determine: heat loss from lack of insulation or air infiltration, leaks shown by evaporative cooling, radiant heat characteristics, excessive heat generated by defective electrical components.

$700.00 ・ 2 hr 30 min

Professional evaluation of the Structural, Electrical, Plumbing, and Mechanical components of the building. This is a non-destructive process where the engineer examines accessible portions of the building, including the crawlspace and attic where they are present or easily accessible. When applicable infrared thermal imaging is used to determine: heat loss from lack of insulation or air infiltration, leaks shown by evaporative cooling, radiant heat characteristics, excessive heat generated by defective electrical components.

$250.00 ・ 1 hr

The reinspection (commonly referred to as the "Final Inspection") is an inspection to determine if the repairs have been made as agreed upon by the seller and buyer. Email us the following information. Please put the address of the property in the subject line and notation “request for final”. Attach a copy of the repair addendum. State when the work will be complete and when the final inspection report is needed. Attach copies of contractor invoices/receipts to confirm work such as for boiler, HRV service, chimney inspection. Tell us who will be present at the final and/or how to gain access. Tell us who is responsible for the final and how they intend to make payment. The seller is usually responsible for payment of the final inspection. We accept cash, check or credit card. If the seller is not present we usually request their email address and invoice them by square. Generally our policy is to provide the final inspection report after receipt of payment.

bottom of page